WDPP Ust-Kamchatsk

In the 4th quarter of 2013a WDPP was commissioned in the township of Ust-Kamchatsk.

Main characteristics of the WDPP:

Installed capacity: 275kW
Tower’s height: 55m
Wind turbine caliber: 30m
Cut-in-wind speed: 3.5 m/s
W maximum speed: 25 m/s
Survival speed: 42.5 m/s
Manufacturer: Vergnet (France)

This WDPP is adapted to the High North conditions (rated to -40 degree Celsius). With these conditions in mind JCS Mobile Energy has implemented complex equipment improvements.

Expected annual production of WDPP is 700 kW. Payback time – 11 years. Expected service life is more than 20 years. User WDPP OAO YUESK

Thematic links

Technologies > Arctic solution
Technologies > Construction accessibility

Main isolated power center characteristics of the township Ust-Kamchatsk

Township: Ust-Kamchatsk
56°14′00″north latitude 162°32′00″eastern longitude
Population: 4300
Consumer load max: 4130kW
Consumer load min: 530kW
Installed capacity DPS: 8000kW
Potential diesel energy production substitution: 5%

WDPP 275kW installed in the township Ust-Kamchatsk is the first step in building a wind farm with a total capacity of 3mkW

Continue on to the complex wind power generation construction project in Far East of Russia.

Up